Completed projects in Skulte port co-founded by the European Union (EU) 
 
Title of the project "Reconstruction of the South Pier of Skulte Port"
The project was started on December 7, 2004 and completed on October 11, 2007.  
   
The total cost of the project  2’863’806,- LVL
Confounding of the European Regional Development Fund (ERDF) 1’223’746,- LVL

The achieved project objective: 

Reconstruction of the South Pier of Skulte Port, which provides public access to the port, improves the overall quality of port infrastructure and safety of navigation for the increasing freight volumes.

 
Signpost of the Project:
 
South Pier Reconstruction in the port of Skulte.
 
The title of the project "Deepening of the Skulte port aquatorium and channel" 
The project started on November 17, 2009 and was completed on October 26, 2010.
 
The total cost of the project  2’080’240,- LVL
Confounding of the European Regional Development Fund (ERDF) 1’740’145,- LVL

The achieved project objectives: 

Improved sailing conditions in the aquatorium and channel of the Port of Skulte promoting availability and accessibility of the port area, as well as full load provided, thereby enhancing the quality of the port service according to the modern requirements, environmental protection and safety standards.
 
Improvement of maritime safety has been achieved in the port, ensuring the maximum of safe access from the sea to the vessels.
 
The development of the surrounding area has been promoted, new jobs have been created and the financial stability of the Port of Skulte and the local government has been enhanced.
 
Signpost of the Project:
 
Depth of the aquatorium and fairway constitutes 8.20 m.
 
Project title "The fishing wharf reconstruction in the Port of Skulte" 
The project started on April 23, 2007 and was completed on May 22, 2008.
 
The project was implemented in collaboration with the Greater Riga Regional Administration of Agriculture of the Rural Support Service of the Ministry of Agriculture.
 
The total cost of the project  614’072,- LVL
Confounding by the EU Structural Funds 608’923 LVL

Signpost of the Project:

Berthing area of  2'154 m2, with the length of the berth of 247.8 linear meters.
 
Project title "Reconstruction of the Fishing Wharf No.2 in the Port of Skulte" 
The project was started on 15 August 2008 and completed on June 22, 2010.
 
The project was implemented in collaboration with the Greater Riga Regional Administration of Agriculture of the Rural Support Service of the Ministry of Agriculture.
 
The total cost of the project  1 605 083,- LVL
Confounding by the EU Structural Funds 1 419 189,- LVL

Signpost of the Project:

{Berthing area of 1'997, 67 m2, the length of the berth of 156.68 linear meters, projected depth of the berthing area 4.0 m.
 
Project title "Reconstruction of the Fishing Wharf No.3 of the Port of Skulte" 
The project started on January 14, 2009 and was completed on august 2, 2011.
 
The project was implemented in collaboration with the Greater Riga Regional Administration of Agriculture of the Rural Support Service of the Ministry of Agriculture.
 
The total cost of the project  625 422,- LVL
Confounding by the EU Structural Funds 540 914,- LVL

Signpost of the Project:

Berthing area of 650.70 m2, the length of the berth of 96.64 linear meters, projected depth of the berthing area 4.0 m.
 
Project title "The reconstruction of the unloading and storage infrastructure for fishing products at the Port of Skulte" 
The project was started on January 5, 2009 and completed on January 15, 2011.
 
The project was implemented in collaboration with the Greater Riga Regional Administration of Agriculture of the Rural Support Service of the Ministry of Agriculture.
 
The total cost of the project  808 970,- LVL
Confounding by the EU Structural Funds 700 761,- LVL

Signpost of the Project:

Construction for "fish storage and primary processing with the help of equipment"